1. Before construction, the oil, water stains and dust on the surface of the substrate should be thoroughly removed, while keeping the working surface dry.
2. Before use, the reflective primer and reflective paint must be stirred evenly, and at the same time continuously stirred during construction.
3. It must be matched with the factory's reflective primer primer, and after the reflective primer is dry, then spray the reflective paint, and spray two reflective primers on the cement with the best effect.
4. The spray paint film should be thin, the paint film should not be too thick, the thickness is about 20 microns, otherwise the effect is not good.






