Product Characteristics
(1) Room temperature from the dry, smooth light, high elasticity.
(2) With excellent adhesion, weather resistance, permeability, tenacity and wear resistance, good mechanical properties.
(3) Considering the environmental protection issues, there is no need to add a diluent.
(4) Because the car often passes through, add the curing agent to increase the wear-resistant type of the product.
(5) The construction site is in the port, the environment is relatively humid, the product has added anti-skid agent, so that the product has anti-skid performance.
Product Use
Can be applicable to the parking lot, warehouse, conference room, hospital, airport corridor, stadium, auditorium, electronic instrument workshop, computer room, electronic, food parking lot, asphalt color change and other heavy objects rolling workshop and other field painting. It not only has good environmental protection significance, but also is a suitable coating for modern industrial workshop and public places.
Recommended Construction Process
1, The ground foundation is well handled, convex place with grinding machine grinding smooth, concave place with putty filling and grinding smooth.
2, Blow the dust on the ground clean with a hair dryer.
3, Spray the first time to change the color top paint, cover the original color of asphalt.
4, Spray the second time to change the color top paint, so that the ground color looks more full, brighter gloss
Construction Points
1. After asphalt color finish paint cover to stir evenly (with mixer mixing 5 minutes)
2. After the paint mixing first, then into the curing agent mixing evenly (with mixer for 5 minutes)
3. The paint mixing ratio: paint: curing agent =10:1
4. When construction pay attention not to mix other kinds of paint, solvent, pay attention to keep rolling coating environment clean.
5. It should not rain before and after the construction, and the road should be cleaned to ensure that the road is dry and evenly mixed, and the air spraying machine can be sprayed on the road requiring construction. After spraying and drying to traffic (24 hours).
6. After use, the remaining paint and thinner should be sealed separately to prevent moisture absorption.
7. Storage method: store in a closed place in a cool and dry place.
8. Expiry date: 12 months
A Schematic Diagram Of The Construction Structure
Disposal of ground foundation |
The ground dust is treated clean |
Surrounding, color separation area paste good beautiful grain paper |
Spray the color paint for the first time |
After the first spraying, dry for 3-6 hours |
Spray the second paint |
Dry the second color paint for 3-6 hours |
Stick the beautiful grain paper in the underlined area |
The last line |
Technical Parameters
Item times |
Surveillance project |
Unit symbol |
Criterion of detection |
Detection result |
1 |
Status in the container |
...... |
Stir well without hard blocks |
conform to |
2 |
Solid content (after mixing) |
% |
≥60 |
64.2 |
3 |
Drying time |
H |
Table stem 4, hard work 24 |
Table stem 2, work 8 |
4 |
Flexibility |
Mm |
≤2 |
2 |
5 |
Adhesion |
Level |
≤1 |
1 |
6 |
Abrasion performance |
G |
≤0.060 |
0.035 |
7 |
Resistance to shock |
Cm |
50 |
50 |
8 |
Pencil hardness (scratch) |
...... |
≥H |
H |
Note: For a more specific test report, please contact the technician
After-Sales Service
Our company has an experienced professional technical team, which can provide the corresponding construction plan according to the different requirements and actual situation of the owner; During the construction process, with technical problems, our company will do our best to provide technical support; after construction, we will deal with related problems.
Hot Tags: asphalt modifier, China asphalt modifier manufacturers, suppliers, factory, Epoxy Primer Paint, Water based Paint, High Temperature Resistant Pain, Chlorinated Rubber Paint, Alkyds Paint, Asphalt Modifier