Product Features
High gloss, high fixation, excellent chemical resistance, good luster durability and color durability.
Recommended Use
Suitable for the protective top paint in a wide range of atmospheric corrosion environment, to meet the durability and color protection performance of outdoor working equipment such as structural steel, equipment and construction machinery.
Technical Parameter
Resin type / pigment type |
Acrylic resin / selected pigments |
Colour |
All kinds of colors |
Surface |
highlight |
Mixture Ratio |
Mass ratio 3 (main paint): 1 (curing agent) |
Volume Ratio |
2 (base material) : 1 (curing agent) |
Curing Agent |
BG-331-3 |
Density |
About 1.2kg / L |
Volume Solid Part |
51 ± 1% (theoretically) |
Flashing Point |
33℃ |
Mixed Use Period |
About 4 hours (23℃) |
Theoretical Coating Rate |
13㎡ / L (measured at 40 μ m dry film thickness) |
Monolayer Membrane Thickness |
Wet film: 98 μ m Dry film: 50 μ m |
Job Practice |
No gas spraying, conventional spraying, brush brushing |
Thinner |
BX-30 |
Tool Cleaning |
BX-30 |
Volatile Organic Compound |
440 g/L |
Drying Time |
Touch dry: about 1 hour (23℃) |
Completely Solidified |
For 7 days, and at 23℃ |
Heavy Coating Time |
See construction guidance |
Recommended Primer |
Double-component primer and intermediate paint |
Ambient Temperature |
Minimum: -10℃, highest: 50℃. Avoid coating at a relative humidity above 85%. |
The Substrate Temperature |
Lowest: above 3℃ |
Packing Specifications |
Two components: 20kg or 16L |
Storage and product shelf-life |
Products must be stored according to state regulations. It should be kept in a cool and well-ventilated place to avoid too high temperature. The container must be firmly sealed. |
Product shelf date |
1 year. |
Construction Guidance
Surface preparation: YY331, dust, moisture and other impurities before construction. In order to ensure the appearance of the paint film, the primer should be smooth and smooth, without dry spray, orange peel and other surface defects
Maintenance: Remove oil and fat with appropriate cleaning agent and remove salt and other contaminants with (high pressure) fresh water. Remove the rust and loose paint layers with sandblasting or power tools. Clean the residue and apply to the thickness of the paint film.
Mix and dilute: YY331 Is a two-component product with a definite allocation ratio. Stir the base material until evenly smooth, then slowly add the curing agent and stir for 3 minutes. An adjustable-speed power mixer is recommended. Do not stir too much, otherwise it will accelerate the curing and shorten the life of the product. The high temperature will shorten the active phase of the mixture. The low temperature can be extended. Add an appropriate amount of diluent to dilute according to the construction habit.
Construction: YY331Airless spraying, brush coating or conventional spraying.
Ventilation: maintaining good ventilation in closed places is very important for the safety of construction personnel and for maintaining the correct performance of the product. The air must be dry because the product cannot be painted when the humidity exceeds 85%.
Heavy coating time
Physical parameters at different ambient temperatures |
||||||
Ambient temperature |
-10℃ |
0℃ |
10℃ |
20℃ |
30℃ |
|
Refers to the dry touch |
3 days |
3 Hours |
1.5 Hours |
1 Hour |
0.5 Hours |
|
Fully cured (relative humidity: 70%) |
15 Days |
10 days |
8 days |
7 Days |
5 Days |
|
Recoating interval (dead weight coating) |
Minimum |
10 Hours |
8 Hours |
5 Hours |
4 Hours |
3 Hours |
Maximum |
The surface must be clean before recoating, without pulverization and other pollutants. If necessary, the surface should be fully brushed before recoating. |
Security arrangement: Warning: With irritation to the eyes and skin, steam may cause respiratory allergies in sensitive people. May cause allergic skin reactions. Avoid inhalation of vapor. Do not touch the eyes or skin. Ears, eyes, and skin should have protective equipment. To avoid potential respiratory irritation, a suitable respirator is recommended. Wash your skin thoroughly after use. Clothes should be washed and worn. If there is no breathing, breathe mouth to mouth and seek medical attention quickly. First aid: If you accidentally contact your eyes, rinse with water for at least 15 minutes and seek medical advice immediately、
Attempt attention: This document is not a formal technical document and the information listed is reliable. Each value provided is calculated as theoretical data from the formulation of the product. Since the conditions of use are not guaranteed, the information here is not guaranteed by the manufacturer. The product is only used for professional use. If you have any questions, please contact your local Hongfang paint service point or agent.
Published Date: 2021-04-01
Hot Tags: acrylic polyurethane enamel, China acrylic polyurethane enamel manufacturers, suppliers, factory, Zinc Rich Epoxy Primer, Alkyds Paint, Water Rust Converted To Anti Rust Primer, Parking Lot Floor Paint, Acrylic Varnish, Acrylic Polyurethane Enamel